Roof Replacement

Full tear-off or overlay — we tell you which one your roof actually needs.

Replacement day is the most disruptive day in a home's exterior life, so we plan the tear-off, the install and the cleanup to get it done in as few days as possible. If your roof has only one layer of shingles and the deck underneath is sound, an overlay can cost less than a full tear-off. We will tell you honestly which one makes sense for your roof.

What's included

  • Full tear-off down to the deck — or a shingle overlay when you have just one existing layer
  • Deck inspection and rotted-sheathing replacement
  • Synthetic underlayment and ice-and-water shield
  • New flashing, drip edge, and ventilation
  • Installed to manufacturer spec

When to call us

  • Roof is 20+ years old
  • Multiple leaks or widespread shingle damage
  • Repeated repair calls in the same year
  • Selling a home and the inspection flagged the roof
Also worth doing

Replacing the roof? Do the gutters and siding with it.

Gutters come off for a tear-off anyway, and the crew, the setup and the dumpster are already here. Doing it in the same trip costs less than booking the work a year apart, and it is one contractor and one schedule instead of three.

Get One Estimate for All of It